Looking for more than sustainability solutions?

ExecutESG is part of ExecutGroup. Explore our broader range of solutions for leadership, people, strategy and business development.

VS (VSME) & SME Reporting 9 min read

VS (VSME) Report Example for a Metal & Manufacturing SME (2026 Sample)

ExecutESG Editorial Team 28 Nov 2026
VS (VSME) Report Example for a Metal & Manufacturing SME (2026 Sample)

VS (VSME) Report Example for a Metal & Manufacturing SME (2026 Sample)

Precision metal fabricators, CNC machine shops, plastics molders, and contract electronics assemblers (NACE C24–C29) face the heaviest wave of Tier-1 OEM sustainability questionnaires in Europe. When major industrial buyers request your annual data, submitting a standardized EFRAG VS (VSME) report protects you under the 2026 EU Omnibus Value-Chain Cap while proving operational discipline.

Part of our 5-sector completed VS (VSME) benchmark series and paired with our industrial manufacturing ESG software guide and free VS (VSME) reporting template, here is a filled VS (VSME) sample report for a 75-employee contract metal manufacturer.

⚡ Supplying Industrial OEMs That Request Annual Carbon, Scrap & Safety Metrics?

Generate your factory's EFRAG VS (VSME) Basic PDF permanently free at 0 €, or connect Netvisor/Procountor/Fennoa for Category 1 raw-material Scope 3 & 1-click XBRL on Pro (129 €/mo).


Sample Industrial Profile: Ostrobothnia Sheet Metal Oy (75 Staff)

  • Activity & NACE: Laser cutting, CNC bending, robotic welding, and powder-coating (NACE C25.11 / C25.61)
  • Scale (B1): 75 employees (73.5 FTE); €13.8M net turnover; €8.9M balance sheet; 1 owned plant (1.4 ha)
Disclosure Industrial Metric Filled Sample Value (FY2026) Manufacturing Audit Note
B3 Energy Electricity (laser/presses/ovens) 1,380 MWh (100% hydro/wind GoO) Sub-metered powder-coat curing oven accounts for 34% of load.
B3 Energy LPG / Propane (forklifts + backup burner) + Van diesel 165 MWh (14,200 kg LPG + 5,800 L diesel) Shielding gas (Ar/CO2 welding mix) tracked separately (4.8 tCO2e).
B3 GHG Scope 1 / Scope 2 (Location / Market) 48.6 tCO2e / 93.8 t (Loc) · 0.0 t (Mkt) GHG intensity: 10.32 tCO2e / €M (location-based).
B4 Pollution VOCs from surface coating line 1.42 tonnes NMVOC (below 3.0 t permit limit) Disclosed because powder/wet primer booth holds municipal environmental permit.
B6 Water Municipal water withdrawal 1,640 m3 (pre-treatment wash + sanitary) Closed-loop evaporator reduces rinse effluent by 78%.
B7 Circularity Annual raw steel/aluminium input (circularity) 1,420 tonnes steel/Al (38% recycled EAF content) Manufacturing companies report key material mass flow under B7(c)!
B7 Waste Non-hazardous (scrap swarf/skeletons) / Hazardous 188.0 t (95.2% metal recycled) / 6.4 t (sludge/oils) Scrap steel sold back to Kuusakoski/Stena counts as material recovery, not landfill.
B8–B10 Social Workforce, Safety (LTIFR) & CBA 75 staff (61 M / 14 F); 2 injuries / 126,000 h = 15.9; 100% CBA 18.5 h safety & CNC/welding certification training per worker.
B11 Ethics Anti-corruption convictions / fines 0 convictions / 0 € fines Supplier Code of Conduct + export-control screening active.
C3 Scope 3 Purchased metals (Cat 1) + Outbound freight (Cat 4) Cat 1: 2,190 tCO2e (mill EPDs); Cat 4: 114 tCO2e Mill-specific Environmental Product Declarations (EPDs) cut Cat 1 by 31% vs defaults!

What Are the 3 Most Important Manufacturing Nuances in VS (VSME)?

1. Don't Miss B7(c) Annual Mass-Flow for Manufacturing SMEs

Unlike office companies, EFRAG B7 asks companies operating in manufacturing, construction, and packaging to disclose the annual mass-flow of relevant materials used (in tonnes, e.g., 1,420 t steel and aluminium sheet/bar). Pulling this tonnage from your ERP purchase summary also gives you exact physical weights for C3 Category 1 Scope 3 calculations!

2. Welding Shielding Gases & Chiller Refrigerants Belong in B3 Scope 1

Active CO2 share in 82% Argon / 18% CO2 MAG welding gas cylinders and any R410A/R32 refrigerant top-ups on laser chillers are fugitive/process Scope 1 emissions. Adding 2–6 tCO2e from maintenance invoices shows OEM auditors immediately that your factory inventory is thorough.

3. Supplier Mill EPDs Beat Spend-Based Steel Averages

If your factory buys Nordic recycled EAF or low-carbon steel at a higher euro price per tonne, pure bank-spend calculators mistakenly increase your reported carbon footprint! On ExecutESG Pro (129 €/mo), you enter physical tonnes (1,420 t) multiplied by your steel mill's verified EPD factor (kg CO2e / tonne), winning immediate credit in OEM supplier scorecards.


Frequently Asked Questions

1. Does a machine shop without a paint booth or foundry permit report B4 Pollution?

No. If your CNC machining, laser-cutting, or assembly shop operates below national/municipal industrial pollutant reporting thresholds, mark B4 Not Applicable. Only surface-treatment, foundry, or chemical lines with permit-mandated pollutant limits report B4 quantities.

2. Does scrap metal sold to a recycler count as waste under Disclosure B7?

Under EU Waste Framework definitions referenced by EFRAG B7, laser skeletons, stamping offcuts, and machining swarf collected by a licensed metal recycler are reported under non-hazardous waste diverted from disposal to preparation for reuse/recycling, highlighting your 90%+ circular recovery rate.

3. Can a VS (VSME) report also help our customers with CBAM or Product Carbon Footprints (PCF)?

While CBAM applies to direct importers of non-EU iron, steel, and aluminium goods, maintaining facility electricity/gas (B3) and mill-specific raw metal EPD weights (B7/C3) in ExecutESG gives you 90% of the allocation data needed when an OEM asks for part-level carbon intensity (kg CO2e / kg finished part).

4. Should temporary shop-floor agency welders be included in B8 or C5?

B8 covers employees on your own payroll (permanent and fixed-term), while C5 (Comprehensive Module, 50+ employees) separately discloses the headcount/FTE of self-employed contractors and temporary agency personnel working on your site. Always track agency worker accidents in site safety logs (B9 notes).

5. Which ExecutESG plan fits a 50-to-250-employee contract manufacturer?

Start free at 0 € to test B1–B11, or choose ExecutESG Pro (129 €/mo, up to 5 seats) so Finance, HSEQ, and Procurement share one workspace with Netvisor / Procountor / Fennoa ERP sync, C1–C9 OEM tender disclosures, editable Word, and 1-click EFRAG XBRL.

Free 2-Minute Diagnostic

Check Your VS (VSME) & CSRD Readiness Score

Answer 6 quick questions under the EU Voluntary Standard VS (VSME) to discover your compliance gap score, estimated time savings, and generate your free starter report.

Take the Free VS (VSME) Quiz →

Stay Ahead of EU Sustainability Mandates

Get our weekly intelligence briefing on VS (VSME), CSRD compliance, buyer Scope 3 demands, and EcoVadis audits—distilled for European SMEs.

🍪 Your Privacy Options

We use strictly necessary cookies to keep you signed in and protect your session. With your explicit consent, we also use analytics cookies (Google Analytics GA4) to improve our service. You can choose to accept all cookies or only allow essential ones. Read our Privacy Policy.